Every condition on this site surfaces somewhere specific — in the declaration, in the budget or reserve study, on a physical inspection, during the lender's project review, or in a report a state statute requires. Knowing which one tells you where to look, and when.
The order matters more than buyers expect, because the channels do not run in parallel. The documents arrive first and cost nothing to read. The reserve study is usually in the same package and is the single most informative item in it. A physical inspection happens next and is bounded by the unit. Project review happens last, inside the lender's process, where the buyer sees only the outcome — and by then the option period has generally closed.
Conditions found in the first two channels are negotiable. Conditions found in the fourth are usually terminal for that financing. That is the whole argument for reading the package early, and it is why the groups below are ordered the way they are.
In the condo documents
4 findingsWhat the declaration, minutes, budget and disclosures reveal.
In the budget or reserve study
4 findingsWhat the association's own financial reporting shows.
On a physical inspection
9 findingsWhat someone looking at the building can actually see.
When the lender reviews the project
4 findingsWhat agency project review tests for.
Through a state-mandated report
3 findingsWhat milestone inspections and structural reserve studies surface.